EXAMPLES |
ONE FAMILY HOUSING |
HOUSE MODELS |
MORE INFORMATION |
||||||||
|
|
|
|
|
|
|
|||||||
|
|
HOUSE BUILDING AND ENERGETIC RENOVATION (ONLY GERMAN) |
|
|
|||||||||
| |
|
(THIS SIDE SLOW) |
|
|
(ONLY GERMAN)
|
|
|
|
|
|
||
|
FOTOS PLANS |
FOTO SEQUENCES REFERR. TO HOUSE CONSTRUCTION |
|
||||||||||
|
COMFORT HOUSING - SENIOR APPROPRIATE |
|
PRODUCTS AND FEES
|
|
ACCORDING TO
|
HOAI (GERMAN REGULATIONS ON ARCHITECTS AND ENGINEERS FEES)
|
||
|
1. We apply German Regulations on
Architects and Engineers Fees, reduced in up to 30%, resp. their equivalents in the country
of suministry of our products, in case that it is required by the local
authorities. Offers will be given in several regulation-related means and according to financial business managemant rules and calculations. 4. The presented fees are applied nettos, adding sale taxes, if required. |
|||
|
ACCORDING TO
|
CONTRACTUAL ETAPS
|
||
|
THE PRODUCTS |
|
||
|
A) |
Projects
|
||
|
A1)
|
Preliminary studies, consisting in acquiring the necessary dates to develope the project and presentation of outlinings to the client.
|
||
|
A2)
|
Preproject, contains the presentation of plans, descriptions and calculations of possible solutions to the client and to the authorities. They conduce to the elaboration of the definitive project.
|
||
|
A3)
|
Project and presentation to the authorities for construction permits.
|
||
|
|
|
||
|
B)
|
Preparations for Production
|
||
|
B1) |
Elaboration of the Construction Documents (Plans).
|
||
|
B2)
|
Elaboration of the Construction Documents (Specifications and quantities).
|
||
|
|
|
||
|
C)
|
Site Direction
|
||
|
C1)
|
General direction in site, execution control by means of coincidence with the permit plans, the norms and time and cost plans, as well as no technical coordination of contracters
|
||
|
C2)
|
Site engineer incl. general direction
|
||
|
THE FEES |
|||
|
The fees for etaps A+B are given in the following table, according to the complexity of the project. You may take 1,00 € as 1,10 US$ for projects out of the €-zone. Minimum fees are 12000 € for a complete project. Fees for etap C are a basic 15,00 €/m2 VA (Vending Area), minimum 1500 €, additionally hour-based fees (visits to the site and authorities) or as a percentage of the construction costs. Additionally, VAT will be charged.
|
|||
|
m2 VA
|
€/m2 VA from - til
|
||
| Basic m2 VA |
Basic fees from til in € |
additional fees/m2 from til in € |
|
| til 250 | 110 | 12000 bis 15000 | 115,00 - 150,00 |
| 251 - 500 | 251 | 22500 - 32500 |
70,00 - 110,00 |
| 501 and more | 501 | 45000 - 57500 |
50,00 - 65,00 |
|
Fees are distributed
|
according to this formula:
|
||
|
A)
|
Projects
|
||
|
A1) |
9,0 % |
||
|
A2) |
23,0 % |
||
|
A3) |
27,0 % |
||
|
|
|
||
|
B)
|
Preparations for Production
|
||
|
B1) |
12,5 % |
||
|
B2) |
8,0 % |
||
|
C)
|
Site Direction
|
||
|
C1) Generally
C2) Generally
|
20,5 %
C1 by 1,5
|
||
|
Berlin and Brandenburg and special cases (Only site inspection acc. to law) |
Visits to the site or authorities will be
remunerated with a minimum of 175 € for a maximum of 2 houres incl.
journeys, additionally 135 € for each exceeding initialized hour.
The hourly rate is
fixed in 135 €. Viatics will
be charged.
|
||
|
Division by subprojects
|
(professional areas) as follows:
|
||
|
1. Architecture: |
50 % |
||
|
2a. Installations : 2b. fire protection: |
15 % 15 % aditional |
||
|
3.. Structure incl. Thermical and Acoustic Protection: |
35 %
|
||
|
|
In case of no requirement of special installation projects, the architectural project is a 65%
|
||
|
|
In case of parcial execution of products, fees are raised in 10 percentage points, due to the coordination costs.
|
||
|
|
In case of contraction of only one or two professional areas, corrseponding fees are raised in 10 percentage points, due to the coordination costs.
|
||
|
|
Repetition of projects means a fee reduction of the etaps A+B in 60%. More than 20 repetitions will be submitted to a special fee agreement.
|
||
|
|
Cases of subcontraction of products by the client are treated in the following way:
|
||
|
Observation
|