HOME


NEWS

 

EXAMPLES

 

ONE FAMILY HOUSING

 

HOUSE MODELS

 

MORE INFORMATION

 

SITEMAP

 
 
 
 
 
 
 

IMPRESSUM

 

 

HIGHLIGHTS

YRS BEFORE

 

ONLY PICS .

.. AND BACK

 

HOUSE BUILDING AND ENERGETIC RENOVATION (ONLY GERMAN)

 

KUBUS

STANDARD

 

OFFICE PRESENTATION

 

 

PARTNERS

 



(THIS SIDE SLOW)


ONLY PLANS .

.. AND BACK


BUILDING. SPECIFICATIONS    

(ONLY GERMAN)


MEDITERRAN

BAUCONT. - NORD. HOLZH.


CURRICULUM VITAE

 


CONTACT

 

       

FOTOS PLANS

PROJ 263  +  269

  FOTO SEQUENCES REFERR. TO HOUSE CONSTRUCTION  

NEON - PDH

NAEFH - SKANDIN. HOLZH.

 

PRODUCTS AND FEES

 

   
           

COMFORT HOUSING - SENIOR APPROPRIATE

 

LANDHAUS

EXTRAVAGANCE

       


NEWS


JANUARY 2022 TO
0211206
actually productive activities, and now again studies, participation Security technologies.




MAY 2022



DECEMBER 2021 20211206

BENEATH THIS CHRISTMAS GREETINGS NEWS FROM DECEMBER

DURING THE DAYS FROM 20211206 TO 20220109 THE OFFICE WILL BE CLOSED.

TO ALL MY FRIENDS AND PARTNERS A PEACEFUL AND RECONFORTING CHRISTMAS TIME AND A HAPPY AND SUCCESFUL AND HOPELY CORONA FREE NEW YEAR 2022!





NOVEMBER 2021 20211111 SEMINARY AS TO ROOF CONSTRUCTION ZU DACHBAU, SPECIALLY FLAT ROOFS AND ENERGY SAVING ITEMS





AUGUST-OCTOBER 2021 20210715 - 20211110 DESIGN WORKS FOR WOODEN HOUSINGH, STICK BY STICK UND JOISTS AND CLT, ARCHITECTURE-, STRUCTURE- AND ENERGY SAVING


JULY 2021 20210714 VACATIONS ARE OVER


JUNE 2021 20210614

MODULAR HOUSES:

UPLOADING OF MODULES AND BRING IN SITE OF BY OUR OFFICE STATICLY DESIGNED HOUSES IN SOUTHERN GERMANY
 
 



MAY 2021 20210424-20210430

PARTICIPATING IN THE "DIGITALE BERLINER ENERGIETAGEN 2021"

Special point hydrogen technologies and advanced energy equipment technologies

HOME OFFICE TIL END OF MAY



APRIL 2021 20210424-20210430

PARTICIPATING IN THE "DIGITALE BERLINER ENERGIETAGEN 2021"

Special point hydrogen technologies and advanced energy equipment technologies



MARCH 2021 20210323

MODULAR HOUSES:

UPLOADING OF MODULES AND BRING IN SITE OF BY OUR OFFICE STATICLY DESIGNED HOUSES IN WESTERN GERMANY




THE KINDERGARTEN:

THE SLAB OVER THE GROUND FLOOR IS READY TO BE POURED, BEING THAT THE CONCLUSION OF THE ROUGH CONSTRUCTION


20210302

THE GROUND FLOOR BRICKWORK NEARLY DONE

 



FEBRUARY 2021 20210215

SHORTLY BEFORE THE SNOWY AND FROSTY DAYS, THE BASEMENT CEILING WAS CONCRETED

   



JANUARY 2021 20210123

THE CONSTRUCTION IN THE KITA GO ON - THE SEMI PREFABRICATED CELLAR WALLS ARE EMPLACED

 



DECEMBER 2020
20201203

BENEATH THIS CHRISTMAS GREETINGS NEWS FROM DECEMBER

DURING THE DAYS FROM 20201214 TO 20210108 THE OFFICE WILL BE CLOSED.

TO ALL MY FRIENDS AND PARTNERS A PEACEFUL AND PLEASANT CHRISTMAS TIME AND A HAPPY AND SUCCESFUL AND CORONA FREE NEW YEAR 2021!




20201208

The renovated shower place in the house of the architect


Before   
    New   
 

20201203/20201208

The construction site of the kinder: The basement is excavated and prepared to construct the concrete slab

Preparing the connection to the old building
 
  Preparing of the earth covering surface

 
Steel reinforcement

 
Concrete is arriving    Beginning of pouring the concrete



JULY - NOVEMBER 2020
220200728 - 20201116

Within other small projects, there are 3 major projects in execution:

- the home modules were developed and improved for further constructions

- the remodelation of a conventional OFH to anAmerican-Style-OFH with enlargement in the garden area and second entrance situation, here some impressions of the construction phase

 
MAIN STEEL BEAM FOR SUPPORT OF THE BRICK WALL SUBSTITUTION TO THE GARDEN
 

AMPLIFIED LIVING AND KITCHEN AREA
SECOND ENTRANCE AREA WITH KITCHEN AND (SHOWN) DOUCHE BATH AREA



- Konventional structure design for a kinder, here 1st section rough construction

   
FOUNDATION DETAILS 1ST SECTION

<---CONCRETE SLAB 1ST SECTION      -     WALL BUILDING--->



JULY 2020 020200728

Monting of the modules in situ, the frame is founded on in-earth screwed elements

                 
Modul                                                                                 constructed house



JUNE 2020 200200623

Embarkation of housing moduls for the south of germany, static and constructional planning by our office incl. transport and crane handling facilities


                                     

handling components screwed from above    on the crane ready to lift                    ready loaded



MAY 2020 20200527

German energy saving support scheme update.


20200515


IMPORTANT INFORMATION:
DUE TO COVID QUARANTANE, THE BERLIN OFFICE WAS TEMPORARILY CLOSED, OFFICE WAS MANAGED FROM THE HOME OFFICE IN NEUENHAGEN. FROM 202001515, OFFICE IN BERLIN AND ACTIVITIES WITH CLIENTS ARA PARTIALLY REOPENED.



MARCH/APRIL 2020 20200406

IMPORTANT INFORMATION: DUE TO QUARANTANE, THE BERLIN OFFICE IS TEMPORARELY CLOSED, OFFICE IS MANAGED FROM THE HOME OFFICE IN NEUENHAGEN

The owner managed OFH in Neuruppin leads on. Actual situation:









JANUARY/FEBRUARY 2020  UNTIL 20200224

REDESIGN OF THE WEBSITE

The site was adapted with a new editing software

20200220

PARTICIPATION IN A CONGRESS OF URBAN LIVING DURING THE BAUTEC IN BERLIN FROM 20200218 - TIL 20200221



BEFORE:

MID  DECEMBER  -  RECONSTRUCTION OF A OFH IS GOING ON IN NEURUPPIN, NOW THE CLIENT WILL CONTINUE ON HIS OWN RISKS



END OF JANUARY - A NEW RECONSTRUCTION WILL TAKE PLACE IN BERNAU, THE SAME
BEGINNING OF FEBRUARY - IN BERLIN-KAROW

BERNAU:



BERLIN-KAROW - CHECKING EXISTING STRUCTURE, ENERGY PLANNING, EXECUTION WILL BE BY THE CLIENT:


 




DECEMBER 2019 20191204

BENEATH THIS CHRISTMAS GREETINGS NEWS FROM DECEMBER


DURING THE DAYS FROM 20191214 TO 20200110 THE OFFICE WILL BE CLOSED.

TO ALL MY FRIENDS AND PARTNERS A PEACEFUL AND PLEASANT CHRISTMAS TIME AND A HAPPY AND SUCCESFUL NEW YEAR 2020!





OCTOBER-
NOVEMBER
2019
20191114
 
PARTICIPATING IN THE KONGRESS OF HEINZE GMBH

This year about sustainibility and climate protection with modern constuction materials




20190927 - 20191110, 20191111

THE REMODELATION IN NEURUPPIN IS STARING
, SEVERAL MINOR WORKS WERE PLANNED AND EXECUTED

THIS REMODELATION IS EXECUTED BY THE OWNERS



AUGUST-
SEPTEMBER
2019
20190801 - 20190919, 20190926

VARIOUS MINOR ACTIVITIES, CONSULTING, CERTAIN CHANGES TO GERMAN CONTRACT MODELS

IMPRESSIONS

   




JULY 2019 20190711

CHANGES TO THE OFFICE'S POLITICS ON FEES AFTER THE DEDISION OF THE EuGH ON THE GERMAN HOAI

After the decision of the EuGH on german HOAI, offers will be given in several HOAI-related means and according to financial business managemant rules and calculations.

See changes in
PRODUCTS AND FEES

The german version of the new contracts are available under
DOWNLOADS



JUNE 2019 20190620

Participation in seminaries ARCHITEKTOUR of Heinze GmbH on various construction items




20190614

Structural refactoring of a facade to remove a brickwork pillar in a ground floor for the widening of a window

Last steps:

The contractual structural service is completed, the window is mounted

 



20190611

Structural refactoring of a facade to remove a brickwork pillar in a ground floor (A) for the widening of a window

View from 02/2019



Last steps to insertion of the new steel structure (20190605):

Lateral supports are inserted, as well as the inner steel beam (1). Mounting of the second (outer) steel beam (2), the porting function of the brickwork pillar is canceled. Situation before final inspection this week 24 (3). There will be installed a fire protection enclosure R-90 afterwards.

(1)    (2)    (3)



MAY 2019 20190528

PARTICIPATION IN A SEMINARY ON FIRE PROTECTION AT THE BAUKAMMER BERLIN (ENGINEERS CHAMBER)

This seminary was about new possibilities of high construction (up to 22 m) with wooden baring and closing structures.



20190522

PARTICIPATION AT THE 20th BERLINER ENERGIETAGEN 2019

I'm participating since the 2011 edition, at least.

We dicussed several kinds of mobility, incl. the grid problems with electric devices.

Other item was the measuring systems for controlling and managing of heating systems.

Further on we talked about geothermie and it's problems in Germany due to govt. decisions of charging excessive fees on the electrical sources of the bombing devices.





20190513

W 19 - A WEEK WITH GREAT ADVANCES

CAD 3D WEEKLY COURSE AND KFW-CONGRESS

This last week I planted the basis for the 3D-planning, the implementation will be over the production within the next weeks as laying the ground for the BIM-planning, whose putting to work standard will follow til the end of this year.

The KfW-congress showed that the acceptance of the energetic reconstruction and new construction of buildings for energetic high level performance is high in Germany, while the real performance is low, due to high costs. Without higher governmental subventions, no advances will be possible. To sustainability a exposition by  Prof. Dr. Austmann from teh University of Hannover (only German): https://www.youtube.com/watch?v=-K2q22FqUmA 




20190502

NEW CONTRACT MODELS

After the participation in a curse to construction laws new contract models (only german):
DOWNLOADS



APRIL 2019 20190429

NEW SPECIFICATIONS WITH SECURITY TECHNOLOGIES

After the seminary on security technologies, the specifications have been amplified, incl. these new items, see (only german) DOWNLOADS

Additionally, new costs are displayed on this
(only german) site DOWNLOADS


20190411

PARTICIPATION IN A SEMINARY ON SECURITY TECNOLOGIES

The seminary showed security tecnologies in the areas of fire protection, against burglars, and control of access, as well as other security related controls and their redundance, centralized and remote controlled and conected, incl. the newest changes to norms hereto that verse on security of datatransfer and time of response, internally as well as externally. Further there was shown the necessity to begin planning with a security book of qualities as planning base and inserted in the BIM, but the same way in analogue planning systems. This office will implement the new planning tool until 20190630 and insert it in the KOG (Limit of Costs).



This seminary was hosted by TELENOT, firm dedicated exclusively to this purpose.




20190410

IMPRESSIONS OF THE SMAL OFH TO BE MODIFIED IN THE SOUTH OF BERLIN

Some internal walls were eliminated after heaving studied the structure of the roof. Bigger and more iluminated spaces were created this way. A pellet fired floor heating system will be installed, first pieces are in site. New better isolated windows were istalled. Later, the ceiling and floor will be isolated and the bath room will be modernized. Wihtin 5 - 10 years this summer house wil have an external wall isolation.


                     



MARCH 2019 20190331

DURING THIS MONTH THE OFFICE REALIZED ROUTINES IN THE RUNNING PROJECTS AND OTHER ISSUES. FOR THE MONTH OF APRIL AND MAY NEW TRAININGS AND SPECIAIZATIONS ARE PLANNED, E.G. IN APRIL SECURITY TECNOLOGIES AND IN MAY THE 20th EDITION OF THE BERLINER ENERGIETAGE





FEBRUARY 2019 20190225

NEW VERSION OF THE "ANLAGE 3" TO THE CONTRACT FORMS, DESCRPTION OF SERVICES, ONLY GERMAN UNDER
DOWNLOADS


20190222

The structural consulting for the restauration of a 1890`s facade in Berlin-Charlottenburg is terminated
Abschluss der tragwerksplanerischen Begleitung der Restauration einer Gründerzeitfassade in Charlottenburg


Several interne works are still going on





20190222

Structural refactoring of a facade tor remove a brickwork pillar in a ground floor (A) for the widening of a window

Rough structure is opened, here the external view (A) and the internal view of the pillar. The building is a massive 6 floor high building






JANUARY 2019 20190131

PARTICIPATING AT THE TRIFLEX-SEMINARY ON SEALING OF BACLCONIES, TERRACES AND LOGGIA

Expositions




20190131

CHANGES TO THE CONTRACT FORMS
DOWNLOADS (ONLY GERMAN)


20190111


PARTICIPATING AT THE KNAUF-WORKDAYS DRY WALLS, CEILINGS AND FLOORS WITH GYPSOM BOARDS

Exposition, workshops and lectures




20190104

CHANGES FOR THE NEW YEAR

The new year begins with certain changes: The cost estimations have to be adapted to the new market conditions that ocurred in 2018. The contract conditions for Germany had to be adjusted after a year of experience with the new contraction laws in Germany. Both changes are available (in German) under
DOWNLOADS.



DECEMBER 2018 20181205

BENEATH THIS CHRISTMAS GREETINGS NEWS FROM DECEMBER - 20181211

TO ALL MY FRIENDS AND PARTNERS A PEACEFUL AND PLEASANT CHRISTMAS TIME AND A HAPPY AND SUCCESFUL NEW YEAR 2019!



20181211

 
PARTICPATING IN THE CHARTA FOR WOOD DAY 2018

Lectures and panel discussions with participation of the Federal Minister for Nutrition and Agriculture, about additional building modes with wood as recyclable and sustainable material. Workshop on Urban Mining.





NOVEMBER 2018 20181128

PARTICIPATING IN THE SYMPOSIUM ICOPAL ON FLAT ROOF SEALING AND LIGHT BUILDINGS

Lectures about modern bitumen coverings and norms hereto, as well as different aspects of light buildings: Protection against energy loss, against humidity and acustics, outdoor noise.




20181120/-26

The link
DOWNLOADS leads to new contract conditions for consumers (only german).


20181116

PARTICIPATING AT THE WIENERBERGER MAUERWERKSTAGE IN BERLIN

Hosted by the company Wienerberger lectures about the new code EC6 for brickworks and the DIN 4108 (energy saving) and brickwork sealing according to the new DIN 18531.




20181113

PARTICIPATING IN THE EVENT ESPECIALIZED SEMINARY ON ROOF SEALING

This event was hosted by SOPREMA, a world wide acting production firm of roof sealing products. The lectures versed about  cardboards, plastic films and liquid plastics, as well as roof windows and interruptions in the surface and their border treatments. The legal implications of site control to these works were discussed.




20181109

PARTICIPATING IN THE EVENT ARCHITECT@WORK

This event was hosted by 240 construction firms of interior applications, 6 lectures were held about textiles and structured architecture, specially facades and space shaping by textile structures of all means.



20181105

Structural consulting for the restauration of a 1890`s facade in Berlin-Charlottenburg

Balconies and wooden beams are terminated as rough structures.





OCTOBER 2018 20181029

Structural consulting for the restauration of a 1890`s facade in Berlin-Charlottenburg

The facade has damaged balconies (partially destroyed yet), that have to be substituted, as well as marode wooden beams in the facade area, to be replaced partially and completely.




20181024/-25

Participation "KfW-Energieeffizienzexpertentag" in Berlin

The most important points were lectures and discussions about simple building - projects between efficiency and way of life in Europe and develloping countries, further on about qualifying and support for energy consultants, and their quality control. BIM problems and develloping  were discussed, as well as the  apoports of energy consultants in this matter and sustainability shown through cosntruction and space concepts.

 


Visit to the "PLANERSEMINAR DACHNOLOGIE"

This seminary versed about various themes from roof insulations for flat roofs to green roofs and drainage with it's calculations incl. emergency drainage.





SEPTEMBER 2018 20180917

The corrected version of the Consulting Contract now available (only German):
DOWNLOADS


20180914

Round Table Diskussion Architektur-Quartett 2018



The Diskussion versed on the relation between listing of documents, energy saving and functional changes in scholar buildings


20180907 - 20180911

The Months September and October will present big changes in the office organisation.

As electronical operations of projects and constructions, as well as attention of clients can be executed from the Home Office and at sites and the clients offices, the CLI ATT OF will be closed, to reduce costs. Client visits at the former ADM OF - now HOME OF will be possible in the future. See under link CONTACT.

Former clients can solicite and retrieve their paper version of projects at th CLI ATT OF til 20180921. All projects elaborated before 20131231 will be destroyed in their paper version, but maintained in their  electronic version.


20180906

Visiting the Seminary Reality-Check Energy Changes at the new Airport BER



The new developments in eletrical devices were presented.



AUGUST 2018 20180830

The Fischer Academy on FIxing Materials



Materials and Software were presented and worked on.


20180822

All buildings designed/calculated and/or supervised by me in Venezuela supported the yesterday earthquake magn 7.3. Here some examples:  Pictures of some of the 120 buildings of different types, designs and structures


20180820

To give potential clients a clear prospect of my services, the designation of Architekt+Ingenieur was changed to Bauconsulting. Plans and documents produced by 20180815 and that wear the old designation, will be maintained with these designations they had by these date.



JULY 2018 20180720

My office dedicates services to back construction and reconstructions of buildings. The last contract is for a reconstruction of an old OFH, specially the inner distribution incl. Installation and heating system.
At the outside there will be only new windows and painting visible. This are the actual visions:



After the reconstruction, there will be more information.


20180703

NEWEST VERSION OF THE ARCHITECTS CONTRACT, AVAILABLE ONLY IN GERMAN UNDER DOWNLOADS



JUNE 2018 20180622

PARTICIPATION IN A HEINZE SEMINARY ON DESIGN AND CONSTRUCTION DETAILS OF STADIUMS AND SPORTS FACILITIES




MAY 2018 20180525

FROM TODAY: PRIVACY POLICY HERE (GERMAN VERSION, ASK FOR YOUR ENGLISH COPY)

20180517

PARTICIPATION IN A SEMINARY OF THE FIRM AERECO ABOUT ENERGY SAVING VENTILATION




20180514/-16

IN ACCORDANCE WITH NEW EUROPEAN REGULATIONS ON DATA PROTECTION, THERE HAVE BEEN CERTAIN CHANGES IN OUR GERMAN CONTRACTS. AVAILABLE UNDER DOWNLOADS. THE DECLARATION OF DATA SECURITY ACCORDING TO EUROPEAN LAWS (GERMAN VERSION) AND BDSG (NEU/GERMAN) UNDER Unterlagen für den Bauablauf.


20180508

PARTICIPATION AT THE ANNUAL BERLINER ENERGIETAGE



Lectures, discussions, fair and special events on energy issues and their future in Germany and the EC.



APRIL 2018 20180427

PARTICIPATION AT THE ANNUAL CONVENTION OF GIH (NATIONAL ORGANIZATION OF ENERGY RELATED ENGINEERS AND ARTISANS)



Lectures and discussions on technical issues, such as protection against flood desasters, sun protection and e-mobility, later on the targets of politics, with governmental officers and public banking members, as to legislation and promotion of energy saving.


FOR MAY, JUNE AND AUGUST THERE ARE MORE PARTICIPATIONS AT CONVENTIONS AND SEMINARIES PLANNED, AS TO WOOD CONSTRUCTION, VENTILATION, SPORT AREAS CONSTRUCTIONS AND BRICKWORK BUILDINGS.


20180420

SEMINAR ON FACADES, FORMAL AND TECHNICAL ASPECTS IN BERLIN




20180412

LAST SEMINAR FROM 3 ON FIRE PROTECTION

Fire protection in existing buildings, special aspects new living use of former roofs.


20180406


BASICAL REORGANISATION OF THE COST STRUCTURE AND LEGAL DOCUMENTS FOR OFH CONSTRUCTION

This information is important for OFH construction in Germany. Some facts: The  recycling quote could be rised to 85%, due to the change from massive to wooden building and the new office adapted BIM system, implemented now and constantly renewed by daily use in my office. OFH will be constructed now in KfW-40 modus with ventilation system, leading that to slightly higher costs.

The next links lead to download pdf documents (german):

Link to the new cost structure (german).

The new specifications (german).

Qualities (construction details) of walls, ceilings and foundations (german)

The new standard contract (german).

More
DOWNLOADS (mostly german).

Intuitivity is one of the new means of the site, specially there are links on pictures, but stille there are clicks on written lines next to these picture links.



MARCH 2018 20180326

RECYCLING OF BUILDINGS

DURING THE INVESTIGATIONS FOR THE IMPLIMENTATION OF BIM, MY OFFICE DETERMINATES, THAT RECYCLING OF THE BUILDINGS PLANNED IN MY OFFICE, IS ESTIMATED IN 75%, AT THIS MOMENT (CONSERVATIVE ESTIMATION). COMPLETE RECYCLING WILL NEVER BE POSSIBLE, BUT USING SUITABELE PRODUCTS, IT WILL BE POSSIBLE TO GET TO AN 80%. THE NEXT WEEKS WILL GIVE MORE CERTAINTY.


22.03.2018 - 20180322


FROM NOW ON THE DATE WILL BE DISPLAYED THIS WAY: YEAR - MONTH - DAY. THAT MENAS THAT 22.03.2018 CHANGES TO 20180322.


VERY IMPORTANT FOR MY GERMAN CUSTOMERS: THERE WILL BE IMPORTANT CHANGES IN THE COST STRUCTURES FOR OFH. THESE WILL NOT BE INFORMED HERE. EXCEPTIONS FOR NORTH AMERICAN HOMES AND OTHER FEES.


12.03.2018


ASSISTANCE AT THE ARCHITEKTENSYMPOSIUM ABOUT NEW DIN-NORMATIVES ON WATERPROOF BUILDING METHODS AND MATERIALS, DIN 18531, 18532 18533, 18534 AND 18535, SUBSITUTING THE OLD DIN 18195. THE NEW NORMATIVES ARE EC-NORMAS.




05.03.2018

THE LINK NAEFH - SKANDINAVISCHE HOLZHÄUSER LEADS NOW TO PERSPECTIVE INTERN PRESENTATIONS OF THE 4 HOUSES IN SCANDINAVIAN STYLE "FINN", "JUNA", "AGNETA" AND "HYGGELIGT". IN MY OFFICE ELECTRONICAL SCROLLING THROUGH THIS HOUSES ARE STILL AVAILABLE. THESE ARE THE 4 MODELS:

    FINN  
   JUNA  
AGNETA
  HYGGELIGT




FEBRUAR 2018 28.02.2018

THE LINK NAEFH - SKANDINAVISCHE HOLZHÄUSER LEADS TO PERSPECTIVE PRESENTATIONS OF 4 HOUSES IN SCANDINAVIAN STYLE "FINN", "JUNA", "AGNETA" AND "HYGGELIGT". IN MY OFFICE ELECTRONICAL SCROLLING THROUGH THIS HOUSES IS AVAILABLE. THESE ARE THE 4 MODELS:

FINN   JUNA   AGNETA

HYGGELIGT


23.02.2018

VISIT OF THE BAUTEC ON 22.02.2018 WITH CONGRESS ON FACADES FOR ARCHITECTS AND DESIGNERS



This congress was about facades during history, tendences and investigation around the closing of buildings, so esthetic design, as tecnilogical as fluid-flow-facades and enegetic action facades. A pass through the Bautec with the last tecnologies to end the visit.


13.02.2018

Further changes to the architects contracts model, only in german.


12.02.2018

FIRE PROTECTION TRAINING - BAUKAMMER BERLIN

Redefigning basics of the Fire Protection Projects



JANUAR 2018 24.01.2018

TRIFLEX-ACO-SCHÖCK-SEMINARY ABOUT BALCONY CONSTRUCTION TECHNOLOGIES

Modern techniologies about waterproof, troughs and energy isolation were presented. As special point the new german legislation on construction contracting was presented and discussed.That laeds to changes in my contracting models for Germany.


18.01.2018

FIRE PROTECTION TRAINING - BAUKAMMER BERLIN

Substitution of the second evacuation way in buildings up to  22 mtrs (building class 5 in Germany) by improving means in existing staircases with direct access from flats to the staircase in existing buildings.These measures are necessary, when access by the fire department mobile ladders is not possible (e.g. flats in second row or obstacles in the road side). It's sought that habitants have 30 minutes to leave the building to a safe site on their own effort, while the fire brigade has 90 minutes to fight the fire down.


16.01.2018

THE LINK
NAEFH - SKANDINAVISCHE HOLZHÄUSER LEADS TO PRELIMINARY PERSPECTIVE PRESENTATIONS OF 3 HOUSES IN SCANDINAVIAN STYLE "FINN", "JUNA" AND "AGNETA". IN MY OFFICE ELECTRONICAL SCROLLING THROUGH THIS HOUSES IS AVAILABLE. THESE ARE THE 3 MODELS:

FINN  JUNA  AGNETA


02.01.2018

THE LINK 
DOWNLOADS LEADS TO THE NEW CONTRACT FORMS (GERMAN).



DECEMBER 2017 BENEATH THIS CHRISTMAS GREETINGS NEWS FROM DECEMBER

TO ALL MY FRIENDS AND PARTNERS A PEACEFUL CHRISTMAS TIME
AND A HAPPY AND SUCCESFUL NEW YEAR 2018!





07./08.12.2017

PARTICIPATION IN THE BAUWELT KONGRESS 2017 IN THE KOSMOS BERLIN ON HIGH HOUSING BUILDINGS

In various sociology, urbanism, architecture und technology expositions, future of high housing buildings were discusssed. Results: Construction of these housing types will be more important in a future, while integration in the environment will be augmented (lower floors) and will be meaning their quality and significance.




18.12
.2017

AFTER CHANGES IN THE GERMAN CIVIL CODE, OUR GERMAN CONTRACT MODEL WILL BE CHANGED BY THE 02.01.2018



NOVEMBER 2017 22./23.11.2017

PARTICIPATING IN "ARCHITEKTOUR"



Architectural congress with emphasis in new materials and constructions, specially for fire protection and energetics, architectural presentations and discussions.


16.11
.2017

PARTICIPATING IN BIM (BUILDING INFORMATION MODELING) EVENT AT THE ARCHITECT'S CHAMBER IN BERLIN



Receiving valueful information for new skills and internal investigation projects to be implemented in the course of 2018.



OKTOBER 2017 05.10.2017

CHANGES ON THE SITE, GERMAN VERSION

At HAUSMODELLEN the links are clearer now, due to the new wood buildings (
BAUCONTOR - NORD. HOLZH. -NAEFH - SKANDIN. HOLZH.)

The page HIGHLIGHTS VORJAHRE German version was changed




JULY -
SEPTEMBER 2017
21.09.2017

Participating at the Energieeffizienzexpertentag on 20th of September 2017. Important issues BIM, as well as a symposium to energy saving facts incl. an example from practising. DIN V 18599 as balancing system.





JULY 2017 13.07.2017

To the house models were designed SCANDINAVIAN HOMES, clicking on NORDAMERIKANISCHEN EFHthis new houses are displayed as a new variation of wood built houses which will be offered by september in cooperation with a new partner.



JUNE 2017 23.06.2017

After closing relations to two big customers - one for the dead of the owner last year and one for the closure of the firm in this days - our office will be restructured at this time. That doesn"t mean that there will be any restrictions to the service for our habitual clients. We will continue building more than all OFH, incl. again wooden houses. To this branch we have openend a coop with a new partner. This coop will be productive in the third trimester of this year. The high performance, such formal, technical and energetic will be maintained, and maybe enhanced.

We will give further informations during august and september this year.



MAY 2017 08.05.2017

Handing over of the new OFH near Berlin




06.05
.2017

Participating in the Energietage Berlin 2017 referred to the newest general energy devellopments and specially construction items





APRIL 2017 19.04.2017

The OFH near Berlin: floortiling nearly terminated, left showers, kitchen ready for installation




07.04
.2017

The OFH near Berlin: Advancing, wall tiling terminated, executing floor tiling, the energy pump working





MARCH 2017 27.03.2017

The OFH near Berlin: Exterior plaster I is finished, 2 weeks till overall finish





FEBRUARY 2017 20.02.2017

The OFH near Berlin: Winter is over, good temperature inside and outside, the place for the energy pump prepared,inside and outside, construction will go on





JANUARY 2017 18.01.2017

The OFH near Berlin: Winter stops us, but the slab is drying and electrical, haeating and plimbing rough installations are finished, without the energy pump and the perforations




11.01.2017

Update costs. Only in german available, specially
DOWNLOADS and HAUSBAU UND ENERGETISCHE SANIERUNG.


06.01.2017

The MFH in Berlin: Tiles completed, stair to the roof and chimney nearly finished



A small remodelation in Hamburg as a new plan and calculation work, opening of structure is shown here:





DECEMBER 2016 BENEATH THIS CHRISTMAS GREETINGS NEWS FROM DECEMBER



TO ALL MY FRIENDS AND PARTNERS A PEACEFUL CHRISTMAS TIME
AND A HAPPY NEW YEAR!

07.12.2016
THE OFFICE FONE WILL BE DISCONTINUED FROM NOW ON


23.12.2016

The OFH near Berlin: Inner Plastering, heating and plumbing systems are completed, from today the slab will be filled in to dry til next year




13.12.2016

The MFH in Berlin: Tiles are nearly terminated:




The OFH near Berlin: Windows are fitted, rough installtion electric terminated, sanataries in execution





NOVEMBER 2016 28.11.2016

The MFH in Berlin: Roof-stairs are in its beginning, sanitary objects and porcelaines are in execution




The OFH near Berlin: windows will be fixed, the roof bordering and ceiling are terminated




04.11.2016

The MFH in Berlin: Overall Installations nearly terminated, as well as drywalls




The Northern Germany home - one month to be completed




The OFH near Berlin: Dry ceilings in execution, from 23.11. windows, electricity, plastering and plumbing/heating system






OCTOBER 2016 24.10.2016

The MFH in Berlin: Finishing in fulfilling, Facade renewed with new upper stock, (the old facade on the right) chimney and installation in rough construction




19.10.2016

The OFH near Berlin: Roof covering completed. Next steps: windows, electrical works, plaster works, furtheron heating and plumbing, and slabs




13.10.2016







SEPTEMBER 2016 26.09.2016

The OFH near Berlin: Roof structure is completed, covering begins




23.09.2016

The OFH near Berlin: Roof structure is in construction




19.09.2016

The MFH stock up in Berlin: The rooms are separated




19.09.2016

After 5 years without honorary adjusts and due to tincrease of office costs, as well as more project and building permit standards, we will proceed to a honorary increase of about 8 to 15% from 01.10.2016. The new fees are available under this link:

PRODUCTS AND FEES


09.09.2016/14.09.2016

The new OFH near Berlin: Brickworks executing

14.09.

09.09.



12.09.2016

The Northern German home - the next step to completing




10.09.2016

The MFH stock up in Berlin: Dark, but windows are built in



02.09.2016

The new OFH near Berlin: Foundations concluded, from monday next week, brickworks will be executed





AUGUST 2016 27.08.2016
 
The new OFH near Berlin enters in constructionnphase, ground works are done, steel and concrete next week:




17.08.2016

For administration and organisational reasons, from now on there will be executed buildings in the north of Germany only under special conditions. Buildings in course will be terminated.



05.08.2016

For technical and legal reasons, the contract documents in german have been changed and adapted.



JUNE/JULY 2016 14.07.2016

The OFH in the north of Germany, old section, is now finished, left to fulfill are some internal finishes and gardening, while the living functiosn go on in the new section



MAY 2016 25.05.2016

I
n the north of Germany finishings in the new section are concluded. The older section is now adapted and finished.




17.05.2016

A new OFH is about to be built near Berlin, on this lot and with the shown style, near this house, that was built in the same area





APRIL 2016 25.04.2016

The small project in Bremen is now concluded, again:
1. former situation, 2. Insulation and painting, 3. planned future design, 4. reality now




14.04.2016

This year I participated again in the Berliner Energietage 2016, hearing about energy saving topics.





MARCH 2016 31.02.2016

In the north of Germany finishings are left. All-around-vision, as well as the energy pump, inner and exterior moduls




08.03.2016

Building of a penthouse level on MFH in Berlin, technical engineering consulting and support, steel structure built and partially wood structure





FEBRUARY 2016 25.02.2016

In the north of Germany works go on with the floor heating. To avoid damages, the fotos were taken from the outside.





1
<--Street , Patio facades

<--The steel structure
<--pillar head detail



11.02.2016

In the north of Germany works go on quickly




08.02.2016

Even small projects are executed: 1. former situation, 2. Insulation and painting, 3. future design, painting for a OFH





JANUARY 2016 28.01.2016

After freeze period is over, in the north of Germany works go on, interior plaster works are terminated.






DECEMBER 2015 BENEATH THIS CHRISTMAS GREETINGS NEWS FROM DECEMBER



TO ALL MY FRIENDS AND PARTNERS A PEACEFUL CHRISTMAS TIME
AND A HAPPY NEW YEAR!

10.12.2015

The amendment in Northern Germany is closed, the energy protection system in construction, electrical installations in execution. Further terminations will be completed next year.



Our office will be closed from 19.12.2015 til 03.01.2016.

05.12.2015

OFFICE PRESENTATION
NEW INFORMATIONS!



NOVEMBER 2015 06.11.2015

WIDE AMENDMENT TO AN OFH IN NORTHERN GERMANY, UPPER BRICKWORK TERMINATED





OCTOBER 2015 29.10.2015

WIDE AMENDMENT TO AN OFH IN NORTHERN GERMANY, ROOF CONSTRUCTION TERMINATED




15.10.2015

WIDE AMENDMENT TO AN OFH IN NORTHERN GERMANY, THE FIRST FLOOR IS DONE, WEEK 44 ROOF CONSTRUCTION

  <VIEW TO THE OLD BUILDING     <THE NEW LIVING ROOM
<THE NEW TERRACE    <THE SMALL TERRACE TO THE KITCHEN



SEPTEMBER 2015 24.09.2015

WIDE AMENDMENT TO AN OFH IN NORTHERN GERMANY, TOMORROW POURING OF THE SLAB




21.09.2015

A NEW TASK: WIDE AMENDMENT TO AN OFH IN NORTHERN GERMANY, PLANUM BUILT





AUGUST 2015 18.08.2015

AFTER OFFICE VACATIONS, A LOT OF AREAS WERE FINALLY SERVED TO MY CLIENTS:
- PROJECT OF A CRANE INSTALLATION REBUILDING
- FIRE PROTECTION AND STATIC DESIGN OF A MFH UPSTOCKING
- FINAL OVERHANDING OF AN OFH IN NORTHERN GERMANY (THERE WILL BE FOTOS AFTER SOME WORKS, THE OWNER DECIDED TO DO ON HIS OWN BEHALFS)
AS WELL AS

LEADING ON THE MFH RECONSTRUCTION IN BERLIN, DRY WALLS AND INSTALLATIONS:

VIEW ON THE STAIR   PLUMBING AND DRY WALLS FOR THE BATHROOM

KITCHEN AREA AND STAIR




JULY 2015 OFFICE CLOSED FROM 16TH OF JULY TO 4TH OF AUGUST DUE TO VACATIONS

10.07.2015

THE MFH IN BERLIN HAS NOW NEW WINDOWS: IN A SPECTACULOUSE ACTION WAS BUILT IN THE NEW PANORAMA WINDOW TO THE GARDEN YARD IN THE ROOF PLANT. THE CRANE BROUGHT IT "FLYING" OVER THE ROOF. AFTER REBUILDING THE GARDEN VIEW, THE INNER RECONSTRUCTION WILL BE TERMINATED.


 

01.07.2015

THE OFH IN THE NORTH OF GERMANY NEAR TO BE TERMINATED. LEFT TO DO ARE PORCELLAINES, STAIRS, ROOM DOORS, AND SOME SANITARY INSTALLATIONS, SCHEDULED HANDOVER FOR MID JULY






JUNE 2015 29.06.2015

THE MULTI FAMILY HOUSING (MFH) IN BERLIN GOT A STAIRCASE, THE STAIR CAN BE MEASURED DEFINITELY




11.06.2015

THE MULTI FAMILY HOUSING (MFH) IN BERLIN IS NEARLY DENUCLEATED IN THE LAST FLOOR AND THE 2. FLOOR, THE WINDOW OPENINGS ARE BUILT




THE ONE FAMILIY HOUSING (OFH)  IN THE NORTH WILL BE HEATENEND FROM NOW, HANDING OVER IS WITHIN 1 MONTH






MAY 2015 29.05.2015

REGISTERED AS ENERGY EEFFICIENCE EXPERT FOR GERMANY




22.05.2015

THE HOUSE IN THE NORTH OF GERMANY: ELECTRICAL AND HEATING NSTALLATIONS IN EXECUTION




AND THE NEXT HOUSE NEAR BERLIN TERMINATED, ONLY EXTERIORS AND PAINTING LEFT





RECONSTRUCTION MULTI FAMILY HAOUSING IN BERLIN: CLOSING THE ROOF




18.05.2015

THE RECONSTRUCTION OF THE MORE FAMILY HOUSING IN BERLIN IS HEADING TO AN INTERESTING FASE: BEHIND THE SCAFFOLDING THE NEW COLUMNS AND WINDOW OPENING IN THE LAST FLOOR ARE AT SIGHT AND THE RING BEAM IS BUILT




08.05.2015

ACTUAL SITUATION HOUSE IN NORTHERN GERMANY

  INTERNAL STRUCTURES NEARLY READY (OWNER'S SELF CONSTRUCTION)

  SOON GARDEN WORKS WILL BEGIN (OWNER'S SELF CONSTRUCTION)


06.05.2015


THE RECONSTRUCTION OF THE MORE FAMILY HOUSING IN BERLIN BEGINS - LOOKING BACK ON THE FACADES, THERUNDER THE BEGINNING OF RECONSTRUCTION:



<--THE ROOF SPACE THEN - AND NOW-->

  THE CRANE COMES OVER AND DELIVERS

EXAMPLE: THE STEAL BEAMS



APRIL 2015 28.04.2015

THE "BERLINER ENERGIETAGE 2015" FINALIZED. THE ENERGY CHANGE RELATIVLY STOPPED, DUE TO LOW ENERGY PRIZES AND CO2-PROBLEM IS NOT LONGER A STRONG FACT. ONLY POLLUTION BY ENERGY CREATION FROM COAL AND OIL IS A THEME.

DESPITE, GRWOING ENERGY COSTS IN A NEAR FUTURE SHOULD BE OBSERVED AND COULD BE INTERESTING FOR INVERTING IN ENERGY SAVING MEASURES, WHILE INTERESTS ARE LOW. THERE SHOULD BE DIRECT SUBVENTIONS (NOT ONLY LOW INTERESTS ON SPECIAL CREDITS) FOR THIS KIND OF INVESTMENTS.



21.04.2015

IN THE NORTH OF GERMANY ROUGH CONSTRUCTION IS TERMINATED, TERMINATION BEGINS WITH WINDOWS, INSTALLATIONS AND INTERIOR PLASTERINGS.





MARCH 2015 26.03.2015

IN THE NORTH OF GERMANY ROUGH CONSTRUCTION IS TERMINATED, TERMINATION BEGINS WITH WINDOWS, INSTALLATIONS AND INTERIOR PLASTERINGS.




02.03.2015


TERMINATING INSIDE THE HOUSE NEAR BERLIN - HEATING AND SANITARY SYSTEM ARE CONCLUDET, TOMORROW THE SLAB WILL BE INSTALLED






FEBRUARY 2015 25.02.2015

CLEAN BRICKWORK DONE




16.02.2015

THE ROOF IS CLOSED - BEGINNING OF CLEAN BRICKWORK




04./06.02.2015


ROUGH CONSTRUCTION NEARLY READY - DESPITE OF STORM DAMAGES - AND NOW THE ROUGH CONSTRUCTION PARTY WITH SPLENEDROUS SUN!






JANUARY 2015 22.01.2015

THE NEXT BIG STEP AHEAD IN THE NORTH OF GERMANY: BRICKWORK GROUND FLOOR TERMINATED



SO ANOTHER HOUSE IN SELF CONSTRUCTION




13.01.2015

THE NEW HOME IN THE NORTH OF GERMANY: INITIATING BRICKWORK





FROM NOW ON AVAILABLE AGAIN THE BRAND 
THE GREEN MAPLE AS OWN BRAND OF OUR OFFICE, CLICK ON NORDAMERIKANISCHE EFH, TOO.





DECEMBER 2014 BENEATH THIS CHRISTMAS GREETINGS NEWS FROM DECEMBER



TO ALL MY FRIENDS AND PARTNERS A PEACEFUL CHRISTMAS TIME
AND A HAPPY NEW YEAR!



10.12.2014

THIS HOME NEAR BERLIN GOING AHEAD. IN JANUARY ELECTRICAL INSTALLATIONS AND INTERIOR PLASTER WORKS IF WEATHER HELPS US - THIS HOUSE IN SELF CONSTRUCTION WITH CONSULTING OF OUR OFFICE




02.12.2014


FOUNDATIONS BUILT FOR THE N
EW HOME IN THE NORTH OF GERMANY - FURTHER CONSTRUCTION DEPENDS ON THE WHEATHER

   




NOVEMBER 2014 19.11.2014

INITIATING CONSTRUCTION OF A NEW HOME IN THE NORTH OF GERMANY

 


05.11.2014

ARCHITECT@WORK - HUNDREDS OF INNOVATING PRODUCTS IN ALL AREAS OF CONSTRUCTION AND
SEMINARIES FOR CONSTRUCTION WITH NATURAL RESOURCES MATERIALS AND WORKERS

VISITING PARTICIPATION
            EXPOSITION      SEMINARIES



OCTOBER 2014 24.10.2014

THE NEW HOUSE NEAR BERLIN: ROUGH STRUCTURE BUILT, PARTY




ALL 3 HOUSES IN NORTHERN GERMANY HANDED OVER

HOUSE 1  HOUSE 2 


  HOUSE 3 THE LATEST


10.10.2014

NEW HOME NEAR BERLIN: BRICKWORK DONE, ROOF IN WEEK 44







SEPTEMBER 2014 20.09.2014

NEW CONTRACT FOR A HOME IN NORTHERN GERMANY


19.09.2014

CONSTRUCTION BEGINS IN NEW HOUSE NEAR BERLIN, FOTOS SOON


18.09.2014

FINISHES BEFORE HANDING OVER IN 3 WEEKS IN HOUSE 3 IN THE NORTH - NO STEP IN DUE TO FLOOR WORKS







08.09.2014

LAST WORKS AT THE HOME  3 IN NORTHERN GERMANY - EXTERIORS FINISHED, INTERIOR INSTALLATION AND FINISHES WORKS IN EXECUTION




THE HOME 2 IN NORTHERN GERMANY OVERHANDED TO THE CLIENT





AUGUST 2014 25.08.2014

NEW LINK UNDER HOME TO THE HOUSE OF THE ARCHITECT - THIS PAGE NOW WITH LOTS OF NEW FOTOS!



21.08.2014

LAST WORKS AT 2 HOMES IN THE NORTH AND 1 IN THE BERLIN AREA - INSTALLATIONS AND FINISHES



FLOOR HEATING DISTRIBUTION AND CONCRETE SLAB HEREOVER, WALLFINISHING IN THE BATH ROOM


A FINISHED BATH ROOM IN THE NORTH

A FINISHED BATH ROOM NEAR BERLIN


07.08.2014

LAST WORKS AT 3 HOMES IN THE NORTH AND 1 IN THE BERLIN AREA - INSTALLATIONS AND FINISHES

  AS EXAMPLE TRANSFER STATION FOR ENERGY FROM FAR PELLET HEATING IN THE NORTH

EXAMPLE OF WALL AND FLOOR FINISHES NEAR BERLIN


IN NORTHERN GERMANY A NEW HOUSE WILL ENTER THE DESIGN FASE, WHILE IN THE BERLIN AREA ANEW HOUSE IS NEAR TO BE EXECUTED.

A MULTIFAMILIAR BUILDING WILL BE REFORMED IN BERLIN,
TOO:

:



JULY 2014 16.07.2014

LAST WORKS - HOUSE 2 IN THE NORTH READY TO BE HANDED OVER NEXT WEEK




INSTALLATIONS IN EXECUTION - HOUSE 3 IN THE NORTH READY TO BE HANDED OVER AT LATE AUGUST




10.07.2014


BRICKWORK NEARLY TERMINATED, WINDOWS FIXED - HOUSE NO. 3 IN NORTHERN GERMANY GOES AHEAD




01.07.2014


THE HOUSE NEAR BERLIN GETTING READY, TOO. 5 WEEKS TO HANDLING OVER AND ALL INSTALLATIONS TERMINATED





JUNI 2014 28.06.2014

HOUSES 1, 2 AND 3  OF THE NEW NORTHERN GERMANY SERIE:
- INSTALLATIONS READY - 5 WEEKS TO HANDLING OVER
- EXTERIOR APPERANCE AND INSTALLATIONS READY  - 4 WEEKS TO HANDLING OVER
- IMPRESSIONS OF THE BRICK WALLS - BEFORE AND AFTER FINISHING








19.06.2014


THE THIRD HOUSE OF THE NEW SERIE IN NORTHERN GERMANY: ROOF READY AND BRICKWORK IN EXECUTION




16.06.2014

THE HOUSE NEAR BERLIN A BIG STEP AHEAD - SCAFFOLDING OFF, ONLY INTERNAL FINAL INSTALLATIONS LEFT AND FINISHING



PARTICIPATING IN FIRE PROTECTION EVENT




07.06.2014


ENERGY SAVING RECONSTRUCTION IN THE NORTH NEARLY TERMINATED - THE SAME AS THE FIRST HOME OF THE NEWE SERIE THERE

        


03.06.2014


THE HOUSE NEAR BERLIN - SEVERAL INSTALLATIONS AND FINISHINGS LEFT TO DO - HANDING OVER IN A FEW WEEKS!





MAI 2014 28.05.2014

ROUGH CONSTRUCTION PARTY AT HOME 3 IN NORTHERN GERMANY



THE HOUSE NEAR BERLIN: EXTERNAL AND INTERNAL PLASTER WORKS DONE, DRYWALL CEILINGS AND HEATING AND PLUMBING IN EXECUTION




19.-21.05.2014


PARTICIPATION IN "BERLINER ENERGIETAGE" WITH LOTS OF INFORMATIONS ON THE ACTUAL ADVANCES OF ENERGY SAVING - MUCH TO DO LEFT!




16
.05.2014

ALL HOUSES OF THE NEW NORTHERN GERMANY SERIES: BRICKWORK OF THE HOUSE 3 IN THE FOREGROUND, HOUSE 1 IN THE BACKGROUND ALREADY WITH EXTERIOR PLASTER IN CLOSE UP. THEREUNDER BRICKWORK VISION AND REFORCED CONCRETE DETAIL OF HOUSE 3.
THEREUNDER HOUSE 2 WITH HEATING INSTALLATIONS.




 


AN IMPRESSION OF THE BERLIN HOUSE - INNER AND EXTERIOR PLASTER WORKS IN EXECUTION.





APRIL 2014 28./29.04.2014

THE HOUSES OF THE NEW NORTHERN GEMANY SERIES: SLAB OF THE THIRD HOUSE, POURED AFTER 22.04.2014, IN THE FOREGROUND, THE FIRST HOUSE IN THE BACKGROUND, NOW WITH WINDOWS, THEREUNDER THE SECOND HOUSE, NOW WITH WINDOWS, TOO





AND NEAR BERLIN WE GO AHEAD, TOO: ROOFING AND WINDOWS ARE IN EXECUTION




22.04.2014

THE NEW HOME IN NORTHERN GERMANY: SLAB IN 2 STEPS - AFTERWARDS CONCRETE




14.04.2014

THE NORTHERN GERMANY HOME, INSTALLATIONS STILL IN DISORDER




14.04.2014

THE NWE HOME IN NORTHERN GERMANY, STRONG EQUIPMENT LOOKING FOR GOOD FOUNDATION SOIL




07.04.2014

ONE OF THE HOMES IN NORTHERN GERMANY UPPER FLOOR DRYWALLS



HOME NEAR BERLIN: ROUGH CONSTRUCTION TERMINATED WITH IST PARTY





MARCH 2014 28.03.2014

REMEMBER NEW FONE NUMBERS - FON  +49 30 20672982 - CEL FON +49 171 6415346

THE FIRST FLOOR NEARLY TERMINATED - NEXT WEEK ROUGH CONSTRUCTION PARTY!




19.03.2014

THE BERLIN HOUSE BASEMENT READY AS ROUGH CONSTRUCTION




14.03.2014

BOTH HOMES IN NORTHERN GERMANY ROOFED, INITIATING INSTALLATIONS AND FINISHING

        

THE EXTERIORS OF THE SENIOR HOUSING BUILDING IN NORTHERN GERMANY ARE TO CONCLUDE

  TERRACE WITH EMRGENCY EXIT      ENTRANCE RAMP


08.03.2014

CONSTRUCTION SITE ACTIVITIES IN NORTHERN GERMANY GOING ON - NEAR BERLIN THE CELLAR IS UNDER CONSTRUCTION:





FEBRUARY 2014 12.01.2014

REMEMBER NEW FONE NUMBERS -
FON  +49 30 20672982 - CEL FON +49 171 6415346

CONSTRUCTION SITE ACTIVITIES IN NORTHERN GERMANY - HOUSE 1: ROUGH CONSTRUCTION CELEBRATIONS
HOUSE 2: BRICKWORK - ROUGH CONSTRUCTION CELEBRATIONS - GABLES - STEP ON STEP

HOUSE 1


HOUSE 2


FINALLY, NOW CONSTRUCTION ACTIVITIES ON THE BERLIN SITE, TOO: BASEMENT FOUNDATIONS IN EXECUTION






JANUARY 2014 12.01.2014

FROM TODAY NEW FONE NUMBERS:
FON  +49 30 20672982 - CEL FON +49 171 6415346

30.01.2014

2 WEEKS AGO, ACTIVITIES IN CONSTRUCTION SITES WERE REINICIATED IN NORTHERN GERMANY

Construction of the concrete floor - retoken activities



Slab - new house



DECEMBER 2013 TO ALL MY FRIENDS, PARTNERS AND CLIENTS MY BEST WISHES FOR
A MERRY CHRISTMAS AND A VERY HAPPY NEW YEAR!
!






NOVEMBER 2013 15.11.2013

RECONSTRUCTION OFH II IN NORTHERN GERMANY GOING STEADY



CONSTRUCTION OF THE NEW OFH: TERRAPLAIN, FOUNDATIONS AND BRICKWORK







OCTOBER 2013 22.10.2013

RECONSTRUCTION OFH II IN NORTHERN GERMANY GOING AHEAD


DEMOLITION AND NEW CONSTRUCTION UPPER FLOOR

TWO MORE OFH IN WAY TO BE REALIZED - ONE UNDER CONTRACT, THE OTHER TO BE CONTRACTED - DESIGNS TO BE SHOWN HERE SOON!



SEPTEMBER 2013 30.09.2013

VARIOUS BUILDING CONTRACTS SIGNED FOR OFH IN THE NORTH OF GERMANY, AND GOING AHEAD

RECONSTRUCTION OFH

RECONSTRUCTION SENIOR HOUSING



AUGUST 2013 08.08.2013

THIS HOME IN NORTHERN GERMANY HANDED OVER TO THE CLIENT - TWO WEEKS BEFORE OUR LAST ESTIMATION




01.08.2013

IN THE FOLLOWING THE TWO NEW PROJECTS: IN THE NORTH #477  AS A RECOSNTRUCTION OF AN OFH, THERUNDER #478 NEAR BERLIN. THEN SOME MORE HOUSES IN EXECUTION: AN INTERESTING DETAIL FROM THE RECONSTRUCTION OF THE 3-FAM-HOUSE. THERUNDER ANOTHER HOUSE IN RECONSTRUCTION (#474), AND LAST BUT NOT LEAST THE NEARLY TERMINATED OFH, #473.

<--#477 ACTUAL VISION

<--#477 DESIGNED

<--#478
PLANT                                     VIEWS                                    LOCATION IN A WOODED AND INCLINED AREA

<--#465 A BOW ABSKET OVER OLD HOUSE ENTRANCE

<--#474 A LOT LEFT TO DO

<--#473 IN 3 WEEKS THIS HOME IS HANDED OVER



JULY 2013 31.07.2013

AFTER SUMMER VACATIONS, CONSTRUCTION ACTIVITIES AGAIN GO AHEAD, AS WELL AS NEW PROJECTS BEGIN: ## 476 AND 477 ONE NEW OFH AND ONE OFH-RECONSTRUCTION IN THE NORTH, #478 ONE NEW OFH NEAR BERLIN. INFORMATIONS HERE TO WITHIN THE NEXT DAYS.

ACCORDING TO THE LATEST COST ANALYSIS, AND DUE TO HONORARY ADAPTIONS (GERMAN HOAI RULES), NEW COSTS WILL SUBSTITUTE THE COSTS WE PASSED TO OUR CLIENTS SINCE EARLY 2011, SHOWING AN INCREASE OF A ROUND ABOUT 13%, SEE HERETO 

HOUSE BUILDING AND ENERGETIC RENOVATION (ONLY GERMAN)

AND PRODUCTS AND FEES.

A FURTHER INCREASE WILL TAKE PLACE FROM JANUARY 2014, IN ABOUT 7%, WHEN ENEV 2014 (ENERGY SAVING RULES) WILL  ENTER IN FORCE. 




JUNE 2013 28.06.2013

THE 3-FAMILY-HOME IN NORTHERN GERMANY IS GOING AHEAD, AFTER THE RAINY WEEKS BRICKWORK, THAN WINDOWS AND INNER WORKS CAN BE DONE.





MAY 2013 24./30.05.2013

HEATIING, PLUMBING. AND ELECTRICAL BASIC INSTALLATIONS ARE COMPLETED IN THE OFH IN THE NORTH OF GERMANY
LATER CONCRETE HEATING SLAB AND EXCAVATING FOR ADDUCTIONS

       


17.05.2013

PARTICIPATING AT THE BERLINER ENERGIETAGE 2013

                

This year, highlights were the conscientization of all involved groups: user, constructer of equipment and systems, and politicians, as to the importance to go ahead, in an organized way, with the efforts to make real energy savings based on more hitech and using efficiently the existing systems.



13.05.2013



WHILE IN THE NORDTH INSTALLATIONS ARE COMPLETED (ABOVE), IN MAHLSDORF HANDLING OVER WAS CELEBRATED:

<VIEW FROM LIVING ROOM TO ENTRANCE  <THE LIVING ROOM

  <VIEW FROM THE GALLERY TO LIVING ROOM AND KITCHEN AREA



APRIL 2013 26.04.2013

IN NORTHERN GERMANY GOING AHEAD: PLASTER WORKS INSIDE AND OUTSIDE IN 90% TERMINATED, FINAL ROUND BEGINNING





25.04.2013

AT LEAST TERMINATED AND HABITATED:

THE ARCHITECT'S HOUSE


Ground Floor and 3-D-Simulation


Fotos





15.04.2013

SPEEDING UP IN THE MAHLSDORF HOME



04.04.2013

NORTHERN GERMANY: THE RECONSTRUCTION OF THE SENIOR HOME WILL BE TERMINATED SOON, INNER SPACES ARE NEARLY COMPLETED



NORTHERN GERMANY: THE RECONSTRUCTION OF THE 3-FAMILY-HOUSE GOES ON FIRMLY, HERE SOME SPECIAL TECHNICAL ITEMS: VISION OVER THE NEW PART OF THE WOODEN ROOF CONSTRUCTION AND STABILISING AND OTHER DETAILS





MARCH 2013 12./25.03.2013

BERLIN-MAHLSDORF: INTERNAL FINISHING ARE IN EXECUTION - HERE TILES AND KITCHEN - STAIRS




04.03.2013

IN BERLIN-MAHLSDORF WORKS GO ON - EXTERIORS ARE CLOSE TO FINISH, AS WELL AS INTERIORS





FEBRUARY 2013 28.02.2013

FROM OLD TO NEW - EVEN THEREFOR ARE ROUGH CONSTRUCTION PARTIES! COMPLETE RECONSTRUCTION OF A 3 FAMILY HOUSE IN THE NORTH OF GERMANY




25.02.2013

THE MEDITERRAN STILE HOME IN MÜNSTERLAND IS NOW CONCLUDED AFTER LOTS OF SELFEMPLOYMENT OF THE CLIENTS




16.02.2013

NEW WEBSITE PRESENTATION
WITH SELECTION SURFACE

- No flyouts but groups of themes, intuitively guiding to the sites as on a partial sitemap
- different colours for the language areas: Grey for german, blue for english and yellow for spanish.


14.02.2013

THE HOME IN NORTHERN GERMANY HEADS ON, TOO: WINDOWS ARE SUPPLIED AND BUILT IN. THE HOME IS NOW CLOSED AND FURTHER INTERIOR WORKS CAN BE DONE




06./13.02.2013

ALL EXTERIOR WORKS WITHOUT USE OF WATER CAN BE EXECUTED, WHILE THE INTERIOR WORKS GO ON AND ARE NEAR TO BE TERMINATED, DUE TO THAT THE HEATING SYSTEM IS WORKING.





JANUARY 2013 07.01.2013

DURING FROST FREE DAYS, CONSTRUCTION GOES ON. AFTER BUILDING IN THE HEATING TUBES, THE CONCRETE SLAB WAS POURRED IN THE MAHLSDORF HOME, AND  HEATING CAN BEGIN, TO INDEPENDIZE FURTHER WORKS FROM WINTER INFLUENCE.




DECEMBER 2012

TO ALL MY FRIENDS, PARTNERS AND CLIENTS
A MERRY CHRISTMAS AND A VERY HAPPY NEW YEAR!





11.12.2012

AFTER THE BEGINNING OF WINTER, WORKS ONLY CAN GO ON, WHEN CONSTRUCTION PARTS ARE NOT EXPOSED OR SENSITIVE TO FROST

After the beginning of winter, all construction sites are closed, excepting those works, that are not sensitive to frost, as e.g. installations in the Mahlsdorf home.




02.12.2012

THE MAHLSDORF HOME - EXTERIORS FINISHED, INTERIORS IN EXECUTION WITH TECHNICAL INSTALLATIONS

 


NOVEMBER 2012 23.11.12

PARTICIPATION IN SYMPOSIUM ON BIM (BUILDING INFORMATION MODELING)

Teh basic idea is to vert the middle age constructors all-over thinking in a 3-D-plan of the building, incl. all specialists. This in constant and congruent development of all parts of it. Includes the following of the buildings being after having been constructed. This model is on qualities and quantities of works, too, automatically and shows actual costs day by day while develloping and constructing the building. Can be combined with CPM (Critical Path Method) and DBM (Design-Build-Method). We use IFC (Industry Foundation Classes) as a basic.



THE
3rd HOME IN NORTHERN GERMANY - THE ROOF IS COMPLETED




19.11.12


THE MAHLSDORF HOME - SCAFFOLDING IS AWAY, PORCHES TO BE EXECUTED SOON




15.11.12


THE THIRD HOME IN NORTHERN GERMANY: THE ROGH CONSTRUCTION PARTY WAS HELD



 

08.11.12


NEW DIRECTION OF THE ADM OF: BRAUNSCHWEIGER STR. 19 IN 15366 NEUENHAGEN BEI BERLIN


THE THIRD HOME IN NORTHERN GERMANY: BRICKWORK IS DONE





THE SECOND HOUSE IN NEUENHAGEN - MOVED IN

Certain details are left to do, but the house is handed over




THE MAHLSDORF HOME - EXTERIOR WALL PLASTER AND ROOF CLOTHING ARE DONE



OCTOBER 2012 11.10.12

AMPLFICATION, ENERGETIC RENOVATION AND FOR SENIORS IN NORTHERN GERMANY - DESIGNED BY A COLLEGUE

After having received and adapted the design of a collegue the construction plans and supervision are executed by our office. 5 new rooms in the roof  will be constructed, full energetic renovation incl. heating system and insulations of walls and windows, as well as  general renovation.




THE THIRD HOME IN NORTHERN GERMANY: THE SLAB IS POURED




THE SECOND HOME IN NORTHERN GERMANY: INSIDE AND OUTSIDE READY FOR HANDICAPPED CLIENT




01.10.12


THE SECOND HOUSE IN NEUENHAGEN - 3 WEEKS TO MOVE IN

It already seems a terminated home - painting, floor covering and installation finishes are left to do.




THE HOUSE IN MAHLSDORF - ROUGH CONSTRUCTION PARTY

The rough construction is terminated and the party took place





SEPTEMBER 2012 12.09.12

THE SECOND HOUSE IN NEUENHAGEN - ROUGH WALL PLASTER WORKS OUTSIDE  CONCLUDED, THE CHIMNEY BUILT 
A NEW HOUSE IN THE NORTH OF GERMANY BEGUN

Left: The outside color plaster is left to do, inside dry wall works and plaster works. A little more than a month to move in.
                                                                                  Right: The ground works have begun for the new house in northern Germany

                          


05.09.12


THE SECOND HOUSE IN NEUENHAGEN IS CLOSED - FINISHING IS IN EXECUTION

On the outer wall side plaster works are remaining to do, while in the inside installations and dry walls are in execution, to remain inner plaster works. After that the slab will be terminated before sanitary objekts are installed.




THE MAHLSDORF HOME - THE GROUND FLOOR WAS NOW TERMINATED INCL. THE SLAB

The slab over the ground floor is poured: Steel reforcement, a look ino the living hall and concrete comes over!






AUGUST 2012 23.08.12

THE MAHLSDORF HOME - THE GROUND FLOOR IN 80% TERINATED AND THEFORM IS NOW VISIBLE

Clearly visible the exterior design with curves on the corners: Rear side and entrance zone





20.08.12

THE SECOND HOUSE IN NEUENHAGEN - ROUGH CONSTRUCTION FINISHED

From left down: The crane brings girders in to be built on. Last talks on how works will go on. The last nail traditionally is put by the client - then the decoration corona is shown to all to signalize that rough construction is terminated.






13.08.12


MAIL DIRECTION KH_URBAN@YAHOO.DE NOT LONGER AVAILABLE


12.08.12


THE SECOND HOUSE IN NEUENHAGEN - WINDOWS BUILT IN

Before the roof will be initiated this week with the construction of the wooden roof, for the rough construction party, windows have been built in.




12.08.12

AS WELL, THE MAHLSDORF HOME GOES AHEAD - BRICKWORK IS IN EXECUTION




09.08.12


THE SECOND HOME IN NORTHERN GERMANY - NOW FINISHED AND HANDED OVER

The second home in northern Germany was finished and handed over now after a lot of self construction items. It's a friendly brick wall construction with sunny rooms (e.g. living room) and very elegant bath room (here the shower area) for comfort needs.




03.08.12


THE NEW HOUSE IN MAHLSDORF - UNDER CONSTRUCTION SINCE SOME DAYS AGO

Above remembering plants and views, therunder the first dig, foundation walls and the armoured slab, ready for pouring concrete






NOW THE SECOND NEUENHAGEN HOME IS PREPARED TO RECEIVE THE ROOF CONSTRUCTION - BEFORE THAT, WINDOWS WILL BE BUILT IN





JULY 2012 23.07.12

THE FIRST NEUENHAGEN HOME - VIEW INTO THE UPPER FLOOR

At the left view of the open space for office and living, at the right acceses to the bedroom and children's room





21.07.12


THE SECOND NEUENHAGEN HOME - BRICKWORK IS DONE IN 90% - DRILLINGS FOR THE HEAT PUMP ARE EXECUTED

From left to right: View from the street, view to the entrance area, view to the former bathroom, drilling works





12.07.12


RECENTLY AT THE END OF JUNE: ROUGH CONSTRUCTION OF A MEDITERRAN STYLE HOUSE IN MÜNSTERLAND TERMINATED

From left to right: Tables are waiting for the party, the wooden roof is built up and that's what its looking like from the outside.




08.07.12


THE SECOND NEUENHAGEN HOME - THE FLOOR HEATING AND COOLING TUBES ARE INSTALLED - THE CONCRETE IS POURED - SLAB IS READY

The floor heating and cooling system is now installed and concrete was poured (left to right). Next week wall construction will be initiated.



 TOO:

UCH EIN MFH IN BERLIN WIRD SANIERT WERDEN:

TOP